Thursday, August 14, 2008



WEEK #4.5

The garage floor has been poured. The drain set. Now let the framing begin!!!












This is BaPa Bill's new entry to the garage!

WEEK #4
The survey tools are in place to dig the hole for the drain in the garage floor.

Mr. Mike, our contractor let little Miss Kaylee sit in the backhoe and help him dig the hole for the drain. As you see I didn't have my camera with me to get Kaylee's picture with Mr. Mike.
She really did help him out.
Here's Jose' again getting the concrete up next to the walls for the garage floor.


Getting the concrete leveled out. What a tough job it was in the heat of the day!!

WEEK #2

The walls have been set, now its time for the concrete to be poured!! Our local concrete dudes came to start the day!

Jose' (I really don't know his name, we'll just call him Jose') Helps to get the concrete into the forms for the new garage floor & walls. I can't believe were doing this!!!!!! Oh yes I can!

This picture should have been at the top of the page. I can get so confused with all this stuff being in order and all. But you know me, crazy!!!!!!!!!

The Construction has begun!!!

WEEK #1

















Week one was a messy one, but fun filled none the less. Bapa Bill tearing down the sheetrock, & Nema got to pull all the nails. How much fun for me!!!













See, the mess!! Keeping it cleaned up has been easy so far. Keeping it picked up as we go along.